2013-04-30

Let's Recycle: "SITA confirmed for £900m West London contract"


Link to web site

"SITA UK has been formally named as the preferred bidder for the £900 million, 25-year residual waste treatment contract for the West London Waste Authority (WLWA).

"... The contract covers all aspects of treatment including any necessary transport, the operation of transfer stations, and contracts for outputs such as energy and refuse-derived fuel for the West London boroughs of Brent, Ealing, Harrow, Hillingdon, Hounslow and Richmond-upon-Thames. It will involve handling up to 300,000 tonnes of waste from households per year.

"SITA will take over the operation of two rail-linked waste transfer stations in West London, via which waste collected from more than 1.4 million residents in the boroughs will be transported by rail to a new energy from waste (EfW) facility in Severnside, South Gloucestershire."

Evening Standard: "French-owned Sita UK poised to land £900m waste deal"


Link to web site

"French-owned utility firm Sita UK is set to take over the disposal of rubbish in west London, in a £900 million scheme that will mean 300,000 tonnes of trash a year are no longer sent to landfill.

"Sita UK, part of Suez Environnement, is leading a consortium that plans to collect the waste from six boroughs and burn it in a new purpose-built electricity plant in Gloucestershire.

"The six councils — Richmond-upon-Thames, Ealing, Brent, Harrow, Hillingdon and Hounslow — are responsible for collecting rubbish from 1.4 million people, living in 600,000 households.

"At present, the boroughs send waste that cannot be recycled to four landfill sites in Abingdon, Bicester, Calvert and Bletchley."